Pipeweed Path 3 Phase Project
This project was conducted in three separate phases which started in May 2024.
Phase 1 connected two separate cabins to meet the requirements of the HOA square footage requirement.
Phase 2 included a deck around the southern exterior.
Phase 3 was started in July 2025 and included building of a kitchen and living room.